Title and LocationConstruction BudgetYear Completed
Naval Air Station, Building 626
Pensacola, Florida
$3,448,5122001
Building 626, located at the Naval Air Station in Pensacola, Florida is identified as a historic structure and is the site of the Navy's Officer Candidate School. Charles Davis, senior project manager of record assisted in completion of the design and construction of the complete interior renovation, bathroom design; berthing room renovation; corridor renovation; plumbing and fixture renovation; new HVAC ssytem; and new electrical system.
Project Size:45,000 SF
Role:Charles Davis, Personal Experience - Senior Project Manager of Record
Reference Contact:Karla P. Atkins, 850-452-4616 x139
Contract #:N62467-00-C-3732
Design-Build
Title and LocationConstruction BudgetYear Completed
Naval Air Station, Jacksonville, D-B Renovation to Hangar 116
Jacksonville, Florida
$2,669,340.822003
Project work included asbestos and lead paint abatement, complete renovation of north and south lean-to's, patching and painting of exterior facade, painting of hangar bay as well as epoxy coating of the entire hangar bay floor, renovation of hangar doors, removal and replacement of lean-to roofing material and reflashing of existing clear story windows to prevent leaks, and installation of foam fire protection system for hangar bay area. As well as the renovation of mechanical, electrial and plumbing.
Project Size:122,500 SF
Role:Charles Davis, Personal Experience - Project Manager of Record
Reference Contact:Susan Hueler,904-542-5571x258
Contract #:N69272-02-C-0039
Installation
Title and LocationConstruction BudgetYear Completed
Fleet Industrial Supply Center of Fuel Loading Arms
NAVFAC, Jacksonville, Florida
$1,453,4262005
The project involved the design, manufacture, and installation of four hydraulically powered mairen fuel leading arms and the replacement of all hydraulic and electrical control systems. As senior project manager, Charles Davis assisted the design and development of the stanchions for the concrete bases.
Project Size:N/A
Role:Charles Davis, Personal Experience - Senior Project Manager and electrical designer of Record
Reference Contact:Barbara Czinder, 904-270-6317x104
Contract #:N69272-03-C-2028
Electrical Upgrade
Title and LocationConstruction BudgetYear Completed
Marine Corps Logistics Base,Electrical Upgrade BLDG 3500
Albany,Georgia
$438,632.002004
As Senior project manager, Charles Davis oversaw and assisted in the removal and replacement of two main distribution panels and feeders. Including 2 (3) Phas Pad-mounted 150 kva transformers, switchboards, and motor control centers. Demolition work included asbestos abatements.
Project Size:N/A
Role:Charles Davis, Personal Experience - Senior Project Manager of Record Project Manager of Record
Reference Contact:Alexander S. Carr, 229-639-5603
Contract #:N62467-03-C-0144
Renovation
Title and LocationConstruction BudgetYear Completed
Naval Air Station, Renovation to Fitness Center
Jacksonville,Florida
$1.359.843.452003
Charles Davis served as co-project manager during the partial demolition of the interior of Building 867 and installation of a new interior. This project included interior demolition, structural,mechanical [HVAC], and electrical renovations and complex architectural carpentry.
Project Size:15,00 SF
Role:Charles Davis, Personal Experience - Co-Project Manager of Record
Reference Contact:Susan Hueler,904-542-5571x258
Contract #:N69272-02-C-1035
Installation
Title and LocationConstruction BudgetYear Completed
Naval Air Station Jacksonville, Sewer Main Lining
Jacksonville,Florida
$194,418.002004
Project work included the installation of a cast in place storm drainage lining along Albermarle Road between WASP and Ranger Streets at the Naval Air Station, Jacksonville, Florida. Included in the project was the video inspection of the lining before and after installation.
Project Size:8,000 Linear Feet
Role:Charles Davis, Personal Experience - Project Manager of Record
Reference Contact:Susan Hueler,904-542-5571x258
Contract #:N69272-04-C-1008
Design/Repairs
Title and LocationConstruction BudgetYear Completed
Naval Air Station Jacksonville, Design/Repairs to Brig Bldg 409
NAVFAC,Jacksonville,Florida
$568,961.002003
The project included removal of 6 existing air handling units, cutting and supporting of roof structure for a new roof-mouthed AHU, and installation of six AHU's. Related project activities included removal and replacement of existing copper domestic hot/cold water lines in the vertical chases, complete removal of existing pneumatic controls, and installation of new DDC control systems.
Project Size:18,000 SF
Role:Charles Davis, Personal Experience - Project Manager of Record
Reference Contact:Patricia D. McDonald, 904-542-5571x125
Contract #:N69272-03-C-0017
Removal
Title and LocationConstruction BudgetYear Completed
Naval Submarine Base, Housing Air Conditioners
Kings Bay,Georgia
$1,499,537.002005
This project consisted of removing 250 air conditioning units, air handlers, thermostats and furnace platforms, removing/disposal of refrigerant from all units. After removal/disposal of units, project calls for installation of 200 2 ton and 50 1/2 ton high efficient [12 seer heat pump units].
Project Size:200 houses-over 340,000 SF Total
Role:Charles Davis, Personal Experience - Senior Project Manager of Record
Reference Contact:Bobbie Chestnut,912-573-4613
Contract #:N69272-04-C-3009
NAVFAC
Title and LocationConstruction BudgetYear Completed
Renovation to Building 781
Pensacola,Florida
$11,467,7622002
Charles Davis was the senior project manager of record for the design/build project to the Naval Air Station in Pensacola, Florida. The project consists of life safety upgrades and office space renovations to NEXCOM's warehouse facility. Upgrades consisted of fire protection, electrical, and mechanical HVAC and plumbing.
Project Size:693,375 SF
Role:Charles Davis, Personal Experience - Senior Project Manager of Record
Reference Contact:Sharon Burgdoff
Contract #:N62467-00-C-3732
NAVFAC
Title and LocationConstruction BudgetYear Completed
Kennel,Building 1348
Jacksonville,Florida
$279,6472004
Contract #N69272-03-C-2013 involved the demolition of an existing 800 SF military working dog [MWD] kennel and the design and reconstruction of a new kennel with the capacity to house 12 canines. The kennel was designed to meet the requirements of OPNAVIST 5585.28.9 CFR and the configuration, size and amenities of the NAS Jacksonville MWD kennel. Design included all engineering and structural requirements, specification of mechanical systems and supporting ductwork.
Project Size:5,000 SF
Role:Charles Davis, Personal Experience - Senior Project Manager of Record Project Manager of Record
Reference Contact:Vivkie L. Hunter, 904-270-6317x106
Contract #:N69272-03-C-2013
NAVFAC
Title and LocationConstruction BudgetYear Completed
Veterinary Clinic, Building 537
NAVFAC,Jacksonville,Florida
$503,4952004
The facility had previously housed ammunition storage and as a result lead dust was found on the building's exhaust fans. In addition, tile flooring with asbestos contaminate mastic required removal. Constructon included: all piping, erection of interior walls, roof repairs, installation of new floor coverings, windows, doors, cabinetry, and ceiling grid, installation of HVAC system and ductwork, wiring of electrical system, installation of light fixtures, interior painting and all associated signage.
Project Size:6,250 SF
Role:Charles Davis, Personal Experience - Senior Project Manager of Record
Reference Contact:Crystal Life, 904-542-8745x115
Contract #:N69272-03-C-0037
Southeast Roicc
Title and LocationConstruction BudgetYear Completed
Healthcare Support Office Building, Bldg. 2005
Jacksonville,Florida
$683,475.392005
Construction consisted of the design and construction of a 4,000 SF addition to the existing Healthcare Support Office, Building 2005 at Naval Air Station Jacksonville. The two story addition is located on the north side of the existing building and provides new efficient, flexible office spaces and file storage areas.
Project Size:4,000 SF
Role:Charles Davis, Personal Experience - Senior Project Manager of Record Project Manager of Record
Reference Contact:Brenda Schwelling, 904-542-5571x134
Contract #:
Print